Informacja

Drogi użytkowniku, aplikacja do prawidłowego działania wymaga obsługi JavaScript. Proszę włącz obsługę JavaScript w Twojej przeglądarce.

Tytuł pozycji:

Scheduling incremental actions to build a comprehensive national protected area network for Papua New Guinea

Tytuł:
Scheduling incremental actions to build a comprehensive national protected area network for Papua New Guinea
Autorzy:
Vanessa M. Adams
Nadya Dimitrova
Hugh P. Possingham
James R. Allan
Caitlin D. Kuempel
Nate Peterson
Alu Kaiye
Malcolm Keako
Vivitskaia J.D. Tulloch
Temat:
implementation planning
land‐sea connectivity
land‐sea planning
marxan
systematic conservation planning
Ecology
QH540-549.5
General. Including nature conservation, geographical distribution
QH1-199.5
Źródło:
Conservation Science and Practice, Vol 3, Iss 2, Pp n/a-n/a (2021)
Wydawca:
Wiley, 2021.
Rok publikacji:
2021
Kolekcja:
LCC:Ecology
LCC:General. Including nature conservation, geographical distribution
Typ dokumentu:
article
Opis pliku:
electronic resource
Język:
English
ISSN:
2578-4854
Relacje:
https://doaj.org/toc/2578-4854
DOI:
10.1111/csp2.354
Dostęp URL:
https://doaj.org/article/c09f2cf8618748809deea20b88ce35ac  Link otwiera się w nowym oknie
Numer akcesji:
edsdoj.09f2cf8618748809deea20b88ce35ac
Czasopismo naukowe
Abstract Systematic conservation planning identifies priority areas to cost‐effectively meet conservation targets. Yet, these tools rarely guide wholesale declaration of reserve systems in a single time step due to financial and implementation constraints. Rather, incremental scheduling of actions to progressively build reserve networks is required. To ensure this incremental action is guided by the original plan, and thus builds a reserve network that meets all conservation targets, strategic scheduling, and iterative planning is needed. We explore the issue of scheduling conservation actions using the national scale conservation plan for Papua New Guinea (PNG), commissioned by the PNG Conservation and Environment Protection Authority that identifies a comprehensive set of priority areas that meet conservation targets in both the land and sea. As part of the planning process a subset of areas were identified in collaboration as priorities for immediate action—termed areas of interest (AOIs). However, the extent to which targets are met if action stopped after implementing the AOIs is unknown. We test three possible implementation scenarios based on these priority areas to measure target achievement and shortfalls. We then consider how iterative planning would interact with scheduling actions to identify new long‐term priorities that will meet missing targets. Our results show that while a large number of conservation targets are met within the AOIs there are shortfalls for protecting threatened and range restricted endemic species. Meeting targets for these would require an updated set of national priorities and an additional 13% of land area compared with if all areas identified in the original assessment were protected in a single time step. This provides important insights into the benefits of strategic scheduling of implementation, as well as the need for capacity to monitor action and update priorities as implementation proceeds.

Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies